What changed in the bottom reinforcement?

I compared the geometry in two drawing revisions issued by the structural engineer. Bar marks 6 and 103 show how the change was recorded in the bar schedule.

Bar schedule comparison

Original issue: bar mark 6, nine bars at 3.75 m each.
Original issue: bar mark 6, nine bars at 3.75 m each.
Revision A: bar mark 6, four bars at 3.75 m each.
Revision A: bar mark 6, four bars at 3.75 m each.
New bar mark 103: five bars at 4.50 m each.
New bar mark 103: five bars at 4.50 m each.
See the corresponding drawing details
Bottom reinforcement before the revision
Bottom reinforcement before the revision
Bottom reinforcement in revision A
Bottom reinforcement in revision A
Scope and sources

I compared two reinforcement drawings issued by the structural engineer. The details and schedule rows refer to the same area before and after revision A. My work shown here is the geometric comparison; reinforcement design and approval are outside its scope.

Element and geometry
Bottom reinforcement in the same drawing area before and after revision A.
BIM workflow
I compared the structural engineer’s two revisions against the geometry and bar schedule.
What I checked
Bar mark 6 went from nine bars to four. Five bars appear under the new mark 103.
Evidence
Matching plan details and schedule rows. Reinforcement design and approval were outside my role.